Home > SERVICES > Data Centre Audit
Data Centre Audit
by John Herbert | Director
Introduction
Data centre audit - Imagine for a moment the consequences following a power outage or air conditioning failure in your data centre, your losses could be counted in the millions, coupled with disaffected customers your business may take months to recover.

Always on is the mantra, however reality often blocks the way,
the Uptime Institute reported that the cost of an information outage
caused by just a single infrastructure failure can sometimes exceed
the whole annual budget for your infrastructure operation.
Furthermore, while infrastructure failures only represent less than
four percent (4%) of all outage events, they account for twenty
five (25%) or more of all outage downtime.
Since we can't yet operate high density data centres without
electrical power, and the requisite cooling, the E&M infrastructure is a
critical element of data centre operation. And operator and managers need a tool
to ensure that all practical measures have been undertaken to ensure the
stability, and reliability.
Why Audit?
Why does a data centre require an audit?
Unlike other environments data centres are unique in that they are continuously evolving IT and communication requirements, technology and hardware upgrades.
Even new data centres, between initial conception and closeout will most likely change the IT equipment hardware configuration.
Furthermore over time new hardware, and IT configurations are added to cope with increasing demand, this requires additional electrical power and computer equipment. For example newer blade servers allow more IT capacity to be fitted into a standard computer rack than ever before, but can the cooling system cope?
Unchecked expansion affects the stability of the E&M infrastructure systems
In the same way as an accountant reviews your finances to ensure that all the credits and debits matched, a data centre audit verifies that the data centre infrastructure is sound, and operating correctly.
End Users
End users often assume that a datacentre will perform as advertised, experience indicates otherwise. The US based Uptime Institute, creator of the Tier I-IV specification have added there considerable support, recommending an independent audit, trust but verify.
independent auditing recommended by Uptime Institute
Having an independent consultant audit your infrastructure provides confirmation
that your teir3 datacentre delivers your promises to your customers.
Solutions
Kelcroft's data centre audit is an independent your report card for the essential E&M infrastructure that
underpins your data centre operations.
It is a systematic methodical assessment of the essential, and
non-essential Building Services (E&M) that support your data
centre.
Data centre audit comprises:
- Condition survey
- Technical audit of the M&E infrastructure
- Record site environmental data
- Verification of management systems
- Reliability analysis
- point failure analysis
- Historical outage review
The findings from the audit investigation is packaged and presented as comprehensive report - provide a report card on the health of your data centre.
Experience
Designing the critical support systems to keep you operational 24/7, benefits:
- Experience matters
- Millions of square feet online
- Professional responsive approach
- Personal service
- Trusted results
data centre audit, infrastructure audits for creating value added data centres, and mission critical facilities in Hong Kong, China, Asia.

Kelcroft helps you creates international standard state of the art data centres, computer rooms, and mission critical facilities giving you trouble free operation and peace of mind. With millions of square feet already operational you can trust Kelcroft's expertise to design, and deliver a problem free data centre environment.
the experts recommend an Annual data centre audit to ensure that the critical systems are working at peak performance
Kelcroft's international data centre experience delivers a competitive edge for your business. Our experience and expertise includes:
Mechanical services design
- Heating, Ventilation, and Air Conditioning
- Indoor air quality
- Close control air conditioning
- Contamination control
- Cogeneration plants
- Cooing towers
- Thermal storage
- Temperature and Humidity control
- Environmental monitoring
- Building automation systems
Electrical services design
- Power distribution
- Backup power generation systems
- Grounding, bonding, and earthing
- Lighting
- Lightning protection
- Telecommunications
- Uninterruptible Power Supply (UPS)
Fire protection design
- Total Gas Flooding suppression
- Fire alarm systems
- Fire detection systems
- Smoke Control
- Pre-action fire protection systems
- VESDA system
Security design
- CCTV
- Personnel Access control
- Alarm systems
- Intruder detection and alarm
Plumbing and drainage design
- Water detection
- Flood protection
- Drainage and pumping systems
Miscellaneous
- Energy Audit
- Computational Flow Dynamics (CFD)
- Standby Generator & fuel systems
- Reliability Analysis
- Selection & Coordination studies
- Operation and maintenance protocols
- Review of Service level contracts
Hot Spots
To find out more about CFD modelling and how we solving data centre cooling problems such as hot spots, call the experts....... [read more]
Further Information
For further information regarding Kelcroft's services, call today, our Hong Kong office telephone: +(852) 2335 9830, send us a fax +(852) 2335 9862, or send us an email message